Land Screening
LiveDraw a polygon. Ten public data sources are called in parallel — grid, terrain, water, soil, land cover, ownership, access, hazard — and you get a scored verdict with every input traceable.
The problem.
A bankable site report costs ₹2–5 lakh and takes four to eight weeks.
That is fine when you are looking at three sites. It is impossible when the question is which three, out of four and a half million parcels.
So we run the cheap, computable checks across everything first. A human gets in a car only after that. The expensive report still gets written — about the right site.
What it does.
Funnel a state to a shortlist
Districts, then substations, then parcels — counts recomputing as you tighten. Dry-run before commit, undo a bad batch.
- ~105 districts across three states
- 1,730 KA and 873 MH substations, 323 at ≥220 kV
- 4.49M KA survey parcels
Ten sources, one verdict
Polygon or pin, up to 150 acres. Twelve to fifteen cards plus excellent / good / moderate / poor, every input traceable.
- Grid: kV class, installed MVA, evacuation MW
- Terrain: slope, flatness, directional slope
- Water: 20-yr rainfall, GloFAS, surface water
Two rulebooks
The same site judged for solar yield or for data-centre suitability. Data-centre mode runs 17 auditable knockouts.
- Seismic zone, CRZ, coastline
- Airport obstacle-limitation surfaces
- Groundwater, guidance values, encumbrance
Pipeline and field work
A shortlisted site moves through a role-based pipeline with a full audit trail. Surveyors work offline on mobile.
- Land → technical → legal → admin → approved
- Every state change attributed and timestamped
- 6-page assessment and 7-page thesis PDFs
Under the hood.
Public data, called live. Every card cites its source and date.
Generated Diligence Deliverables
Automated institutional outputs generated within ~30 seconds of polygon screening.
6-Page Site Assessment Dossier
Complete terrain, slope, water catchment, and regulatory boundary analysis ready for investment committees.
Substation Interconnection Matrix
MVA capacity, kV class, evacuation feasibility, and transmission line distance calculation.
17-Point Data Center Knockout Audit
Seismic risk, coastal regulation zone (CRZ), airport obstacle limitation, and groundwater availability.
Where it sits.
Three of the six stages — all before capital commits.
Screen a live asset or explore with demo data.
For Capital Partners
We will run one of your candidate sites or asset portfolios live on a call with our team.
For Operators & Developers
Explore modules on demo data without logging in. Test live parameters and workflows.