ToolsLand Screening

Land Screening

Live
Solar & data-centre sites · Karnataka, Maharashtra, Tamil Nadu

Draw a polygon. Ten public data sources are called in parallel — grid, terrain, water, soil, land cover, ownership, access, hazard — and you get a scored verdict with every input traceable.

land screening live preview
4.49M
Parcels indexed
1,730
Substations mapped
17
Data-centre knockouts
~70%
Legal diligence automated
01

The problem.

A bankable site report costs ₹2–5 lakh and takes four to eight weeks.

That is fine when you are looking at three sites. It is impossible when the question is which three, out of four and a half million parcels.

So we run the cheap, computable checks across everything first. A human gets in a car only after that. The expensive report still gets written — about the right site.

02

What it does.

01

Funnel a state to a shortlist

Districts, then substations, then parcels — counts recomputing as you tighten. Dry-run before commit, undo a bad batch.

  • ~105 districts across three states
  • 1,730 KA and 873 MH substations, 323 at ≥220 kV
  • 4.49M KA survey parcels
02

Ten sources, one verdict

Polygon or pin, up to 150 acres. Twelve to fifteen cards plus excellent / good / moderate / poor, every input traceable.

  • Grid: kV class, installed MVA, evacuation MW
  • Terrain: slope, flatness, directional slope
  • Water: 20-yr rainfall, GloFAS, surface water
03

Two rulebooks

The same site judged for solar yield or for data-centre suitability. Data-centre mode runs 17 auditable knockouts.

  • Seismic zone, CRZ, coastline
  • Airport obstacle-limitation surfaces
  • Groundwater, guidance values, encumbrance
04

Pipeline and field work

A shortlisted site moves through a role-based pipeline with a full audit trail. Surveyors work offline on mobile.

  • Land → technical → legal → admin → approved
  • Every state change attributed and timestamped
  • 6-page assessment and 7-page thesis PDFs
03

Under the hood.

Public data, called live. Every card cites its source and date.

NASA POWERPVGISOpen-MeteoERA5GloFASKSRSACNominatimOSRM / ORSESA WorldCoverJRC surface waterISRIC SoilGridsCGWBBhoomiKaveri guidance values
04

Generated Diligence Deliverables

Automated institutional outputs generated within ~30 seconds of polygon screening.

PDF Report

6-Page Site Assessment Dossier

Complete terrain, slope, water catchment, and regulatory boundary analysis ready for investment committees.

Grid Feasibility

Substation Interconnection Matrix

MVA capacity, kV class, evacuation feasibility, and transmission line distance calculation.

Technical Diligence

17-Point Data Center Knockout Audit

Seismic risk, coastal regulation zone (CRZ), airport obstacle limitation, and groundwater availability.

Related ResearchWhen Capital Outpaces the Land: The Infrastructure AI Actually Runs On
Read thesis
05

Where it sits.

Three of the six stages — all before capital commits.

01
Identify
02
Assess
03
Develop
04
Finance
05
Operate
06
Monitor
Deploy Pyse OS

Screen a live asset or explore with demo data.

For Capital Partners

We will run one of your candidate sites or asset portfolios live on a call with our team.

For Operators & Developers

Explore modules on demo data without logging in. Test live parameters and workflows.